Brick Calculator (Bricks, Mortar, Cement and Sand)
Estimate how many bricks, how much mortar and how many cement bags and sand you need for a brick wall, for UK, US, Pakistani and Indian brick sizes.
Quantities are planning estimates. Check local building codes, product data and your supplier's guidance before ordering or building.
How to use this calculator
Enter the wall's length and height, subtract doors and windows, and choose your brick size, joint thickness and whether the wall is one or two bricks thick. The calculator counts the bricks from the brick size plus joint, works out the mortar as the space between bricks, and converts it into bags of cement and cubic metres of sand for the mix you choose.
Formula
Bricks per m² of wall face = 1 ÷ [(brick length + joint) × (brick height + joint)], multiplied by the number of wythes. Bricks = net wall area × bricks per m² × (1 + waste). Wet mortar = wall volume − volume of the bricks. Dry mortar = wet volume × 1.33; cement = dry volume × 1 ÷ (1 + sand parts) × 1,440 kg/m³ ÷ 50 kg per bag; sand = dry volume × sand parts ÷ (1 + sand parts).
Calculator credits
Calculator developmentJulia Edwards
Editorial supervisionSamad Aslam Khan
Expert reviewHammad AhmadFounder ThaykaydarSaab - Online Construction Platform
Published byThe Calculatorz
Last updated
Read how we research, test, review and correct our calculators in our editorial policy.
Frequently asked questions
How many bricks are in a square metre?
About 60 UK standard bricks (215 × 65 mm with 10 mm joints) per m² for a half-brick wall, and twice that for a one-brick wall.
How many bricks per square foot?
About 6.75 US modular bricks per ft² with ⅜ in joints in a single wythe.
How much waste should I allow?
Typically 5% for straightforward walls and up to 10% where there are many cuts, corners or openings.
Which mortar mix should I use?
1 : 4 to 1 : 6 cement–sand mixes are common for general brickwork; stronger mixes are used below ground or in exposed walls. Follow your engineer's or local code requirements.
Why is dry mortar volume larger than wet?
Dry cement and sand shrink when water is added and voids fill, so about a third more dry material is needed. The 1.33 factor is a common estimating rule.
Does this include the collar joint and footing?
A one-brick wall includes the joint between the two wythes. Foundations, wall ties, lintels and damp-proof courses are not included.
References & methodology sources
These sources support the calculator’s formula, definitions, thresholds, units or result interpretation.
- Brick Industry Association. (2009). Technical Note 10: Dimensioning and estimating brick masonry. View source
- Chudley, R., & Greeno, R. (2020). Building construction handbook (12th ed.). Routledge. View source
- Peurifoy, R. L., Oberlender, G. D., & Garold, D. (2018). Estimating construction costs (6th ed.). McGraw Hill. View source
- International Code Council. (2024). International Residential Code. View source